A walkway looks like the easy job. It is narrow, short and flat, and that is exactly why the small decisions show. Glenmoor Concrete is a referral service that connects South Jordan homeowners with licensed local concrete contractors, who pour the paths.

What makes a walkway different

  • Joints do the work. A narrow slab needs its joints laid out on purpose. Concrete Network says a 4-inch slab should have control joints 8 to 12 feet apart, per its control joint guide. Ask where each joint goes.
  • Traction. A broom finish gives grip. A smooth trowel finish is slick when wet or iced. Say what the path is for: a front door in January is not the same as a garden path.
  • Slope. Water should leave the path and the house. Ask which way each section drains. A path that holds water becomes a winter ice sheet.
  • Where it ends. The ends are where walkways fail: at the steps, at the garage floor, at the house foundation and at the public sidewalk. Ask for isolation strips where new concrete meets old or the house, and ask who handles the junction at the street.

Checklist: before the contractor starts

  1. Mark what you want. Paint or flags on the lawn, with the route and width. Walk it.
  2. Tell them about your lines. Blue Stakes of Utah 811 asks for at least 3 business days of notice before any excavation, free and required by law. Show the contractor private lines such as sprinklers yourself.
  3. Ask about the base. Concrete Network says the compacted base under a slab should be at least 4 inches thick in total, per its subgrade guide. Ask what is planned for the path, and what happens to soft soil or sod.
  4. Ask about the mix. At least 4,000 psi and a water-cement ratio below 0.50, per Concrete Network. And air-entrained, usually 4 to 7 percent of the volume per the Portland Cement Association.
  5. Ask about curing. The American Concrete Institute says better curing is the cheapest way to raise strength and durability. Wait at least 24 hours before walking on it, per Concrete Network.

Where a walkway meets the city

If your new path ties into the public sidewalk, or the job touches the sidewalk, curb or apron, it may need one of the encroachment permits in South Jordan's fee schedule; the city's Engineering and Building staff, at 801-254-3742, can say whether it does. South Jordan's own street standards, in Chapter 7, Streets, call for sidewalk concrete 5 inches thick on 6 inches of compacted base. That is written as the city's standard for public sidewalk, and it is not stated as a rule for a private path to your front door. The same standards say that on construction sites the contractor must notify the engineering inspector 24 hours before pouring any concrete.

Whether that standard applies to your job is the same office's call (Engineering page); confirm there, because rules change. The permits page lists the fees and the offices.

Whether a private walkway on your own lot needs a city building permit is the Building Department's answer to give, at 801-446-HELP (4357).

Winter and salt

The first winter is the dangerous one. Concrete Network says to avoid any deicers the first winter after placement, because new concrete is more susceptible to salt damage, and it names deicers with ammonium nitrates and ammonium sulfates as especially harmful. Use sand on a new path. Scaling, where the surface flakes, comes mostly from freeze-thaw with salt on concrete that lacks entrained air or was finished badly; the American Concrete Institute says entrained air minimizes scaling from ice-removal chemicals.

Cost

Walkways are priced by the square foot like other flatwork. The national figure for a plain gray driveway is $5 to $8 per square foot per Concrete Network, and a decorative one is $8 to $21. A real quote depends on your lot, the route and the finish, so get written quotes and compare what each one names. See the cost page.

Common questions

How wide should a front walk be?

That is a design choice. Ask the contractor for a width that suits how you use the door, and confirm any city requirement for where it meets the sidewalk with Engineering.

When can you walk on a new path?

At least 24 hours after placement, per Concrete Network. Keep pets and children off it until then. If you are planning a patio too, the patio page covers the joint layout.

Ready to ask for a match? Use the contact page.

Where these numbers come from: Concrete Network for the national per-square-foot figures, and South Jordan's Chapter 7 street standards and Engineering page for the sidewalk rules, all read in November 2026.