South Jordan Concrete Permits and Right-of-Way Rules

South Jordan encroachment permit fees, the offices to call, the city's sidewalk and curb standards and the Daybreak rule.

Last reviewed November 2026

This page lists the permits, fees and offices that touch a concrete job in South Jordan. Glenmoor Concrete is a referral service that connects South Jordan homeowners with licensed local concrete contractors, and the city is the authority on every item below.

The short version, as a checklist

  • Work at the street end (apron, sidewalk, curb cut) may need a South Jordan encroachment permit. The city's fee schedule lists a Curb Cut Encroachment Permit and a Standard Encroachment Permit; the city's Engineering and Building staff, at 801-254-3742, can say which one, if any, a job needs.
  • A slab on your own lot: the Building Department answers whether it needs a permit.
  • Early or late hours: work before 7 am or past 10 pm needs a Noise Disturbance Permit approved by the Salt Lake County Health Department, with a copy to the city Building Department.
  • Daybreak: the Design Review Committee must approve exterior changes first.
  • Before digging: call Blue Stakes of Utah 811.
  • State highway: UDOT has its own access permit.
  • Ask the contractor who pulls each permit and who books each inspection.

Which office handles what

OfficeWhat it handlesHow to reach it
EngineeringEngineering permits, applied for through the city's online portal801-254-3742, the direct line for Engineering and Building staff, per the city's Engineering page
Building DepartmentBuilding permits and inspection requests through the CityView portal; enforces the 2021 International Residential Code801-446-HELP (4357), per the Building Department page
AddressEngineering and Building offices1600 West Towne Center Drive, South Jordan, UT 84095

If you are unsure which office to start with, call the main line and ask. Fees and rules change, so those two numbers are also the way to confirm everything on this page.

The fees the city lists

South Jordan's fee schedule lists these encroachment-related fees:

FeeAmount
Curb Cut Encroachment Permit$231
Standard Encroachment Permit$318
Traffic Control Fee (Encroachment Permit)$581

Ask the city's Engineering and Building staff, at 801-254-3742, which of these applies to a particular driveway job, and confirm the current amounts there, because fees change. Ask the contractor whether the quote includes it.

The city's concrete standards for public work

South Jordan's Chapter 7, Streets standards say:

  1. Sidewalk concrete is 5 inches thick on 6 inches of compacted base.
  2. Curb and gutter must use a 7.5-bag concrete mix from October 15 to April 15.
  3. Notice: on construction sites the contractor must notify the engineering inspector 24 hours before pouring any concrete.

These are standards for public improvements: public sidewalk and curb and gutter. They are not stated as rules for a private patio, and whether your apron or sidewalk repair falls under them is a question for the city's Engineering and Building staff at 801-254-3742; confirm there, because rules change.

For a general comparison, Concrete Network says many municipalities require the apron to be 5 or 6 inches thick, per its thickness guide. Engineering can say what South Jordan expects for an apron.

Do you need a building permit for a slab on your lot?

South Jordan enforces the 2021 International Residential Code, per its Building Department page. Whether a slab on a private lot needs a permit is the Building Department's answer to give. Call the Building Department at 801-446-HELP (4357) with the size and location of the slab, and write down what you are told.

Footings are a different matter. South Jordan's design criteria, on its Building Department page, set frost depth at 30 inches minimum from the bottom of the footing to finished grade. If your job includes a footing, for example for a post or a wall, a licensed contractor and the city's inspectors handle it.

Other rules that touch a concrete job

  • Noise. Construction before 7 am or past 10 pm needs a Noise Disturbance Permit approved by the Salt Lake County Health Department, with a copy to the city Building Department, per the Building Department page.
  • Daybreak. The Design Review Committee must approve any exterior change to a home first. In a sub-association, both the sub-association and the master association must approve, per Daybreak's design review page.
  • RVs. Daybreak's rules summary limits RVs and trailers in a driveway to 24 hours at a time. A third-party copy of the zoning code (Zoneomics), not the city's own site, says RVs on single-family lots go behind the front line of the main building, with 72 hours of temporary front-yard storage. The city's main line, 801-446-HELP (4357), can confirm the current wording, because rules change. See RV pads.
  • 811. Blue Stakes of Utah 811 asks for notice at least 3 business days before any excavation, and says the service is free and required by law.
  • State highways. A driveway connection onto a state highway needs a UDOT conditional access permit.
  • Old concrete. The city's neighborhood dumpster program does not accept concrete. See replacement.

Questions for the contractor

  • Does the job touch the public right-of-way, and who applies for the permit?
  • Who books the inspection, and when?
  • Who places the 811 request?
  • Will the work start before 7 am?
  • Does the quote include permit fees?

Common questions

Who do you call first?

Start with the Engineering line, 801-254-3742, if the job touches the street. Use the Building Department, 801-446-HELP (4357), for anything on your lot.

Does the contractor need a license?

Utah's specialty classification for concrete is S260 Asphalt & Concrete Contractor, per the state's classification list. Utah Code 58-55-305 exempts from contractor licensing the alteration, repair, remodeling, addition to or improvement of a building with a contracted value under $7,000, labor and materials included, per the statute text. Whether a flatwork job falls under it is for the contractor and the state licensing division to say. Check any contractor on the state's lookup yourself.

Ready to ask for a match? Use the contact page or read what concrete costs.

Where these numbers come from: South Jordan's own pages and standards, Daybreak's rules pages and the state sources linked above, all read in November 2026.